{"id":6236,"date":"2026-04-29T10:25:45","date_gmt":"2026-04-29T02:25:45","guid":{"rendered":"https:\/\/txjpcba.com\/?p=6236"},"modified":"2026-04-29T10:25:45","modified_gmt":"2026-04-29T02:25:45","slug":"can-you-review-my-files-before-production","status":"publish","type":"post","link":"https:\/\/txjpcba.com\/ru\/can-you-review-my-files-before-production\/","title":{"rendered":"Can you review my files before production?"},"content":{"rendered":"<h2 data-section-id=\"h9217\" data-start=\"0\" data-end=\"44\">My files before production<\/h2>\n<p data-start=\"46\" data-end=\"314\">Yes, most professional manufacturers will review your files before starting <strong data-start=\"122\" data-end=\"138\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> to ensure everything is correct and production-ready. This process is commonly called a pre-production review, engineering review, or DFM (Design for Manufacturability) check.<\/p>\n<p data-start=\"316\" data-end=\"464\">It is an essential step for both <a href=\"https:\/\/txjpcba.com\/ru\/%d1%81%d0%b1%d0%be%d1%80%d0%ba%d0%b0-%d0%bf%d1%80%d0%be%d1%82%d0%be%d1%82%d0%b8%d0%bf%d0%b0-%d0%bf%d0%b5%d1%87%d0%b0%d1%82%d0%bd%d0%be%d0%b9-%d0%bf%d0%bb%d0%b0%d1%82%d1%8b\/\"><strong data-start=\"349\" data-end=\"375\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0440\u043e\u0442\u043e\u0442\u0438\u043f\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong><\/a> and mass production, helping to identify potential issues early and avoid costly errors.<\/p>\n<figure id=\"attachment_6238\" aria-describedby=\"caption-attachment-6238\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-6238\" src=\"https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/04\/Can-you-review-my-files-before-production.jpg\" alt=\"Can you review my files before production\" width=\"800\" height=\"597\" srcset=\"https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/04\/Can-you-review-my-files-before-production.jpg 800w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/04\/Can-you-review-my-files-before-production-300x224.jpg 300w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/04\/Can-you-review-my-files-before-production-768x573.jpg 768w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/04\/Can-you-review-my-files-before-production-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-6238\" class=\"wp-caption-text\">Can you review my files before production<\/figcaption><\/figure>\n<h3 data-section-id=\"joaiwk\" data-start=\"466\" data-end=\"493\">What files are reviewed<\/h3>\n<p data-start=\"495\" data-end=\"612\">Before production begins, your <strong data-start=\"526\" data-end=\"542\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> provider will typically review a complete set of manufacturing files.<\/p>\n<p data-start=\"614\" data-end=\"628\">These include:<\/p>\n<ul data-start=\"630\" data-end=\"809\">\n<li data-section-id=\"1eldwoj\" data-start=\"630\" data-end=\"674\">Gerber files (for <strong data-start=\"650\" data-end=\"671\">\u041f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0441\u0442\u0432\u043e \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442<\/strong>)<\/li>\n<li data-section-id=\"4laxkj\" data-start=\"675\" data-end=\"702\">BOM (\u0441\u043f\u0435\u0446\u0438\u0444\u0438\u043a\u0430\u0446\u0438\u044f \u043c\u0430\u0442\u0435\u0440\u0438\u0430\u043b\u043e\u0432)<\/li>\n<li data-section-id=\"1tryhsy\" data-start=\"703\" data-end=\"737\">Pick and place (centroid) file<\/li>\n<li data-section-id=\"gmk8px\" data-start=\"738\" data-end=\"759\">\u0421\u0431\u043e\u0440\u043e\u0447\u043d\u044b\u0435 \u0447\u0435\u0440\u0442\u0435\u0436\u0438<\/li>\n<li data-section-id=\"4in23m\" data-start=\"760\" data-end=\"775\">Drill files<\/li>\n<li data-section-id=\"w9fsl8\" data-start=\"776\" data-end=\"809\">Special instructions or notes<\/li>\n<\/ul>\n<p data-start=\"811\" data-end=\"910\">Having a complete and accurate file package ensures a smoother review process and faster quotation.<\/p>\n<p align=\"center\"><a href=\"\/ru\/%d0%bf%d0%be%d0%bb%d1%83%d1%87%d0%b8%d1%82%d1%8c-%d0%bf%d1%80%d0%b5%d0%b4%d0%bb%d0%be%d0%b6%d0%b5%d0%bd%d0%b8%d0%b5-%d0%bf%d0%be-%d1%81%d0%b1%d0%be%d1%80%d0%ba%d0%b5-%d0%bf%d0%b5%d1%87%d0%b0%d1%82\/\"><button style=\"background: black; color: white; padding: 8px 20px; border: none; cursor: pointer;\">\u041f\u043e\u043b\u0443\u0447\u0438\u0442\u044c \u0446\u0438\u0442\u0430\u0442\u0443 \u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/button><\/a><\/p>\n<h3 data-section-id=\"vwmw6m\" data-start=\"912\" data-end=\"940\">What manufacturers check<\/h3>\n<p data-start=\"942\" data-end=\"1097\">During the review process, engineers will carefully analyze your data for potential problems that could affect <a href=\"https:\/\/txjpcba.com\/ru\/%d1%83%d1%81%d0%bb%d1%83%d0%b3%d0%b8-%d0%bf%d0%be-%d0%bc%d0%be%d0%bd%d1%82%d0%b0%d0%b6%d1%83-%d1%81%d0%bc%d1%82\/\"><strong data-start=\"1053\" data-end=\"1069\">\u0421\u0431\u043e\u0440\u043a\u0430 SMT<\/strong><\/a> or overall product quality.<\/p>\n<p data-start=\"1099\" data-end=\"1121\">Common checks include:<\/p>\n<ul data-start=\"1123\" data-end=\"1435\">\n<li data-section-id=\"1tcodqq\" data-start=\"1123\" data-end=\"1168\">BOM accuracy (MPN, quantity, consistency)<\/li>\n<li data-section-id=\"exnio1\" data-start=\"1169\" data-end=\"1212\">Component availability and alternatives<\/li>\n<li data-section-id=\"1ijjigi\" data-start=\"1213\" data-end=\"1262\">Footprint matching between BOM and PCB layout<\/li>\n<li data-section-id=\"179wx6s\" data-start=\"1263\" data-end=\"1305\">Polarity and orientation of components<\/li>\n<li data-section-id=\"yk2lyd\" data-start=\"1306\" data-end=\"1338\">Pad design and solderability<\/li>\n<li data-section-id=\"1pxfa0v\" data-start=\"1339\" data-end=\"1397\">Spacing and placement feasibility for <strong data-start=\"1379\" data-end=\"1395\">\u0421\u0431\u043e\u0440\u043a\u0430 SMT<\/strong><\/li>\n<li data-section-id=\"u4i55k\" data-start=\"1398\" data-end=\"1435\">PCB layer stack-up and drill data<\/li>\n<\/ul>\n<p data-start=\"1437\" data-end=\"1542\">These checks help prevent assembly defects and ensure compatibility with <a href=\"https:\/\/txjpcba.com\/ru\/%d0%bf%d1%80%d0%be%d0%b8%d0%b7%d0%b2%d0%be%d0%b4%d1%81%d1%82%d0%b2%d0%be-%d0%bf%d0%b5%d1%87%d0%b0%d1%82%d0%bd%d1%8b%d1%85-%d0%bf%d0%bb%d0%b0%d1%82\/\"><strong data-start=\"1510\" data-end=\"1531\">\u041f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0441\u0442\u0432\u043e \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442<\/strong><\/a> \u043f\u0440\u043e\u0446\u0435\u0441\u0441\u044b.<\/p>\n<h3 data-section-id=\"1114u9f\" data-start=\"1544\" data-end=\"1568\">DFM and DFA analysis<\/h3>\n<p data-start=\"1570\" data-end=\"1669\">A full review often includes both DFM (Design for Manufacturability) and DFA (Design for Assembly).<\/p>\n<p data-start=\"1671\" data-end=\"1829\">DFM focuses on whether the board can be reliably fabricated, while DFA ensures that components can be placed and soldered efficiently during <a href=\"https:\/\/txjpcba.com\/ru\/%d0%bc%d0%be%d0%bd%d1%82%d0%b0%d0%b6-%d0%bf%d0%b5%d1%87%d0%b0%d1%82%d0%bd%d0%be%d0%b9-%d0%bf%d0%bb%d0%b0%d1%82%d1%8b\/\"><strong data-start=\"1812\" data-end=\"1828\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong><\/a>.<\/p>\n<p data-start=\"1831\" data-end=\"1866\">For example, engineers may suggest:<\/p>\n<ul data-start=\"1868\" data-end=\"1998\">\n<li data-section-id=\"i2wl1e\" data-start=\"1868\" data-end=\"1913\">Increasing pad sizes for better soldering<\/li>\n<li data-section-id=\"72iiu3\" data-start=\"1914\" data-end=\"1945\">Adjusting component spacing<\/li>\n<li data-section-id=\"16m28d3\" data-start=\"1946\" data-end=\"1998\">Optimizing layout for automated <strong data-start=\"1980\" data-end=\"1996\">\u0421\u0431\u043e\u0440\u043a\u0430 SMT<\/strong><\/li>\n<\/ul>\n<p data-start=\"2000\" data-end=\"2061\">These improvements can reduce defects and lower overall cost.<\/p>\n<h3 data-section-id=\"l1hgu8\" data-start=\"2063\" data-end=\"2101\">Feedback and engineering questions<\/h3>\n<p data-start=\"2103\" data-end=\"2194\">If any issues are found, the manufacturer will send you an engineering questions (EQ) list.<\/p>\n<p data-start=\"2196\" data-end=\"2213\">This may include:<\/p>\n<ul data-start=\"2215\" data-end=\"2366\">\n<li data-section-id=\"ymyz4i\" data-start=\"2215\" data-end=\"2262\">Missing or unclear component specifications<\/li>\n<li data-section-id=\"8kjv5i\" data-start=\"2263\" data-end=\"2299\">Conflicts between BOM and layout<\/li>\n<li data-section-id=\"1e0tbkq\" data-start=\"2300\" data-end=\"2333\">Unavailable or obsolete parts<\/li>\n<li data-section-id=\"1ilhuku\" data-start=\"2334\" data-end=\"2366\">Special process requirements<\/li>\n<\/ul>\n<p data-start=\"2368\" data-end=\"2489\">Timely feedback from your side helps avoid delays in <strong data-start=\"2421\" data-end=\"2447\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0440\u043e\u0442\u043e\u0442\u0438\u043f\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> and ensures production stays on schedule.<\/p>\n<h3 data-section-id=\"xrwsdw\" data-start=\"2491\" data-end=\"2514\">Is file review free<\/h3>\n<p data-start=\"2516\" data-end=\"2604\">In most cases, basic file review is free as part of the quotation or onboarding process.<\/p>\n<p data-start=\"2606\" data-end=\"2783\">However, more advanced engineering support, redesign suggestions, or extensive DFM optimization may involve additional charges, especially for complex <strong data-start=\"2757\" data-end=\"2773\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> \u043f\u0440\u043e\u0435\u043a\u0442\u044b.<\/p>\n<p data-start=\"2785\" data-end=\"2855\">It\u2019s always a good idea to confirm this with your supplier in advance.<\/p>\n<h3 data-section-id=\"18u8nj4\" data-start=\"2857\" data-end=\"2889\">Why file review is important<\/h3>\n<p data-start=\"2891\" data-end=\"2968\">Skipping file review can lead to serious issues in <strong data-start=\"2942\" data-end=\"2958\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong>, such as:<\/p>\n<ul data-start=\"2970\" data-end=\"3081\">\n<li data-section-id=\"1rxu9p3\" data-start=\"2970\" data-end=\"3003\">Incorrect component placement<\/li>\n<li data-section-id=\"b96sul\" data-start=\"3004\" data-end=\"3025\">Soldering defects<\/li>\n<li data-section-id=\"77l5sd\" data-start=\"3026\" data-end=\"3047\">Production delays<\/li>\n<li data-section-id=\"1h2p7l5\" data-start=\"3048\" data-end=\"3081\">Increased costs due to rework<\/li>\n<\/ul>\n<p data-start=\"3083\" data-end=\"3203\">A proper review ensures your design is manufacturable and optimized for both <strong data-start=\"3160\" data-end=\"3176\">\u0421\u0431\u043e\u0440\u043a\u0430 SMT<\/strong> \u0438 <strong data-start=\"3181\" data-end=\"3202\">\u041f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0441\u0442\u0432\u043e \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442<\/strong>.<\/p>\n<h3 data-section-id=\"1dmudky\" data-start=\"3205\" data-end=\"3247\">Best practices before submitting files<\/h3>\n<p data-start=\"3249\" data-end=\"3311\">To get the most out of your manufacturer\u2019s review, you should:<\/p>\n<ul data-start=\"3313\" data-end=\"3511\">\n<li data-section-id=\"mxvn46\" data-start=\"3313\" data-end=\"3354\">Provide complete and up-to-date files<\/li>\n<li data-section-id=\"t6t9zv\" data-start=\"3355\" data-end=\"3390\">Use clear and consistent naming<\/li>\n<li data-section-id=\"1c2ensb\" data-start=\"3391\" data-end=\"3420\">Double-check BOM accuracy<\/li>\n<li data-section-id=\"1qv1dq9\" data-start=\"3421\" data-end=\"3463\">Include notes for special requirements<\/li>\n<li data-section-id=\"19m7mn0\" data-start=\"3464\" data-end=\"3511\">Communicate any critical design constraints<\/li>\n<\/ul>\n<p data-start=\"3513\" data-end=\"3598\">This reduces back-and-forth communication and speeds up the <strong data-start=\"3573\" data-end=\"3589\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> \u043f\u0440\u043e\u0446\u0435\u0441\u0441.<\/p>\n<h3 data-section-id=\"1079bb9\" data-start=\"3600\" data-end=\"3614\">\u0417\u0430\u043a\u043b\u044e\u0447\u0435\u043d\u0438\u0435<\/h3>\n<p data-start=\"3616\" data-end=\"3794\">Yes, file review before production is a standard and highly recommended step in <strong data-start=\"3696\" data-end=\"3712\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong>. It helps detect issues early, improves manufacturing quality, and reduces risks.<\/p>\n<p data-start=\"3796\" data-end=\"3990\">\u0420\u0430\u0431\u043e\u0442\u0430\u0435\u0442\u0435 \u043b\u0438 \u0432\u044b \u043d\u0430\u0434 <strong data-start=\"3823\" data-end=\"3849\">\u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0440\u043e\u0442\u043e\u0442\u0438\u043f\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/strong> or large-scale production, a thorough review ensures your design is ready for efficient <strong data-start=\"3938\" data-end=\"3954\">\u0421\u0431\u043e\u0440\u043a\u0430 SMT<\/strong> and reliable <strong data-start=\"3968\" data-end=\"3989\">\u041f\u0440\u043e\u0438\u0437\u0432\u043e\u0434\u0441\u0442\u0432\u043e \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442<\/strong>.<\/p>\n<p align=\"center\"><a href=\"\/ru\/%d0%bf%d0%be%d0%bb%d1%83%d1%87%d0%b8%d1%82%d1%8c-%d0%bf%d1%80%d0%b5%d0%b4%d0%bb%d0%be%d0%b6%d0%b5%d0%bd%d0%b8%d0%b5-%d0%bf%d0%be-%d1%81%d0%b1%d0%be%d1%80%d0%ba%d0%b5-%d0%bf%d0%b5%d1%87%d0%b0%d1%82\/\"><button style=\"background: black; color: white; padding: 8px 20px; border: none; cursor: pointer;\">\u041f\u043e\u043b\u0443\u0447\u0438\u0442\u044c \u0446\u0438\u0442\u0430\u0442\u0443 \u0421\u0431\u043e\u0440\u043a\u0430 \u043f\u0435\u0447\u0430\u0442\u043d\u043e\u0439 \u043f\u043b\u0430\u0442\u044b<\/button><\/a><\/p>\n<p style=\"text-align: center;\">\u0413\u043e\u0442\u043e\u0432\u044b \u043d\u0430\u0447\u0430\u0442\u044c \u0441\u0432\u043e\u0439 \u043f\u0440\u043e\u0435\u043a\u0442 \u043f\u043e \u0441\u0431\u043e\u0440\u043a\u0435 \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442? \u041d\u0430\u0436\u043c\u0438\u0442\u0435 \u043d\u0438\u0436\u0435, \u0447\u0442\u043e\u0431\u044b \u043f\u043e\u043b\u0443\u0447\u0438\u0442\u044c \u0431\u044b\u0441\u0442\u0440\u043e\u0435 \u043f\u0440\u0435\u0434\u043b\u043e\u0436\u0435\u043d\u0438\u0435.<br \/>\n\u041c\u044b \u043f\u0440\u0435\u0434\u043e\u0441\u0442\u0430\u0432\u043b\u044f\u0435\u043c \u043f\u0440\u043e\u0444\u0435\u0441\u0441\u0438\u043e\u043d\u0430\u043b\u044c\u043d\u044b\u0435 \u0443\u0441\u043b\u0443\u0433\u0438 \u043f\u043e \u0441\u0431\u043e\u0440\u043a\u0435 \u043f\u0435\u0447\u0430\u0442\u043d\u044b\u0445 \u043f\u043b\u0430\u0442, \u0432\u043a\u043b\u044e\u0447\u0430\u044f SMT, DIP \u0438 \u043f\u043e\u043b\u043d\u044b\u0435 \u0440\u0435\u0448\u0435\u043d\u0438\u044f \"\u043f\u043e\u0434 \u043a\u043b\u044e\u0447\".<\/p>\n<p style=\"text-align: center;\">\u2714 NDA \u0434\u043e\u0441\u0442\u0443\u043f\u043d\u043e \u2714 \u0411\u044b\u0441\u0442\u0440\u0430\u044f \u043a\u043e\u0442\u0438\u0440\u043e\u0432\u043a\u0430 \u0432 \u0442\u0435\u0447\u0435\u043d\u0438\u0435 24 \u0447\u0430\u0441\u043e\u0432 \u2714 ISO \u0441\u0435\u0440\u0442\u0438\u0444\u0438\u0446\u0438\u0440\u043e\u0432\u0430\u043d\u043d\u044b\u0439 \u0437\u0430\u0432\u043e\u0434 \u2714 \u041e\u0434\u043d\u0430 \u043e\u0441\u0442\u0430\u043d\u043e\u0432\u043a\u0430 PCB &amp; PCBA \u0441\u043b\u0443\u0436\u0431\u044b<\/p>","protected":false},"excerpt":{"rendered":"<p>My files before production Yes, most professional manufacturers will review your files before starting PCB Assembly to ensure everything is [&hellip;]<\/p>","protected":false},"author":1,"featured_media":6238,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[71,445],"tags":[1114,1108,1109,1112,1113,1110,1111],"class_list":["post-6236","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faqs","category-pcb-assembly-faqs","tag-bom-and-gerber-check","tag-files-before","tag-pcb-assembly-file-review","tag-pcb-manufacturing-file-verification","tag-pcba-engineering-review","tag-prototype-pcb-assembly-check","tag-smt-assembly-dfm-review"],"_links":{"self":[{"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/posts\/6236","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/comments?post=6236"}],"version-history":[{"count":2,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/posts\/6236\/revisions"}],"predecessor-version":[{"id":6240,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/posts\/6236\/revisions\/6240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/media\/6238"}],"wp:attachment":[{"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/media?parent=6236"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/categories?post=6236"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/txjpcba.com\/ru\/wp-json\/wp\/v2\/tags?post=6236"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}