{"id":6512,"date":"2026-05-11T15:32:19","date_gmt":"2026-05-11T07:32:19","guid":{"rendered":"https:\/\/txjpcba.com\/?p=6512"},"modified":"2026-05-11T15:32:19","modified_gmt":"2026-05-11T07:32:19","slug":"can-you-optimize-my-bom","status":"publish","type":"post","link":"https:\/\/txjpcba.com\/ja\/can-you-optimize-my-bom\/","title":{"rendered":"Can you optimize my BOM?"},"content":{"rendered":"<h2 data-section-id=\"18ew048\" data-start=\"0\" data-end=\"27\">Optimize my BOM<\/h2>\n<p data-start=\"29\" data-end=\"380\">Yes, optimizing your BOM (Bill of Materials) is a core capability of professional <a href=\"https:\/\/txjpcba.com\/ja\/pcb%e3%82%a2%e3%82%bb%e3%83%b3%e3%83%96%e3%83%aa\/\"><strong data-start=\"111\" data-end=\"127\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong><\/a> providers. A well-optimized BOM not only reduces component sourcing costs but also improves manufacturability, shortens lead times, and ensures stable supply for both <strong data-start=\"295\" data-end=\"321\">\u30d7\u30ed\u30c8\u30bf\u30a4\u30d7PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> \u3068\u5927\u898f\u6a21\u306a <strong data-start=\"338\" data-end=\"354\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> \u3067 <strong data-start=\"358\" data-end=\"379\">PCB\u88fd\u9020<\/strong>.<\/p>\n<p data-start=\"382\" data-end=\"531\">If your goal is to reduce cost, avoid shortages, and improve production efficiency, BOM optimization is one of the most effective steps you can take.<\/p>\n<figure id=\"attachment_6513\" aria-describedby=\"caption-attachment-6513\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"size-full wp-image-6513\" src=\"https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/05\/Can-you-optimize-my-BOM.jpg\" alt=\"Can you optimize my BOM\" width=\"800\" height=\"597\" srcset=\"https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/05\/Can-you-optimize-my-BOM.jpg 800w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/05\/Can-you-optimize-my-BOM-300x224.jpg 300w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/05\/Can-you-optimize-my-BOM-768x573.jpg 768w, https:\/\/txjpcba.com\/wp-content\/uploads\/2026\/05\/Can-you-optimize-my-BOM-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><figcaption id=\"caption-attachment-6513\" class=\"wp-caption-text\">Can you optimize my BOM<\/figcaption><\/figure>\n<h3 data-section-id=\"1o9ijzz\" data-start=\"533\" data-end=\"567\">What BOM optimization involves<\/h3>\n<p data-start=\"569\" data-end=\"711\">BOM optimization is not just about replacing expensive components\u2014it\u2019s a systematic process that evaluates every part in your design based on:<\/p>\n<ul data-start=\"713\" data-end=\"815\">\n<li data-section-id=\"1uwwvur\" data-start=\"713\" data-end=\"721\">\u30b3\u30b9\u30c8<\/li>\n<li data-section-id=\"fo0cbd\" data-start=\"722\" data-end=\"738\">Availability<\/li>\n<li data-section-id=\"v1qeiy\" data-start=\"739\" data-end=\"759\">Lifecycle status<\/li>\n<li data-section-id=\"1nujb3w\" data-start=\"760\" data-end=\"788\">Performance requirements<\/li>\n<li data-section-id=\"14licwo\" data-start=\"789\" data-end=\"815\">Assembly compatibility<\/li>\n<\/ul>\n<p data-start=\"817\" data-end=\"924\">The goal is to create a balanced BOM that meets technical needs while minimizing risks in <strong data-start=\"907\" data-end=\"923\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong>.<\/p>\n<p align=\"center\"><a href=\"\/ja\/%e3%83%97%e3%83%aa%e3%83%b3%e3%83%88%e5%9f%ba%e6%9d%bf%e3%82%a2%e3%82%bb%e3%83%b3%e3%83%96%e3%83%aa%e3%81%ae%e8%a6%8b%e7%a9%8d%e3%82%82%e3%82%8a%e3%82%92%e5%8f%96%e3%82%8b\/\"><button style=\"background: black; color: white; padding: 8px 20px; border: none; cursor: pointer;\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea\u306e\u304a\u898b\u7a4d\u3082\u308a<\/button><\/a><\/p>\n<h3 data-section-id=\"11qqwcd\" data-start=\"926\" data-end=\"959\">Key areas of BOM optimization<\/h3>\n<h4 data-start=\"961\" data-end=\"990\">Component cost reduction<\/h4>\n<p data-start=\"992\" data-end=\"1063\">Engineers analyze each component to identify cost-saving opportunities:<\/p>\n<ul data-start=\"1065\" data-end=\"1205\">\n<li data-section-id=\"1rd90my\" data-start=\"1065\" data-end=\"1121\">Replace high-cost parts with equivalent alternatives<\/li>\n<li data-section-id=\"1p1k51b\" data-start=\"1122\" data-end=\"1169\">Select components with better pricing tiers<\/li>\n<li data-section-id=\"h7thog\" data-start=\"1170\" data-end=\"1205\">Avoid over-specified components<\/li>\n<\/ul>\n<p data-start=\"1207\" data-end=\"1311\">This is especially impactful in <a href=\"https:\/\/txjpcba.com\/ja\/smt%e3%82%a2%e3%82%bb%e3%83%b3%e3%83%96%e3%83%aa%e3%83%bc%e3%82%b5%e3%83%bc%e3%83%93%e3%82%b9\/\"><strong data-start=\"1239\" data-end=\"1255\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong><\/a>, where high component volumes amplify cost differences.<\/p>\n<h4 data-start=\"1313\" data-end=\"1347\">Supply chain and availability<\/h4>\n<p data-start=\"1349\" data-end=\"1432\">A critical part of BOM optimization is ensuring that components are easy to source:<\/p>\n<ul data-start=\"1434\" data-end=\"1566\">\n<li data-section-id=\"69kacy\" data-start=\"1434\" data-end=\"1484\">Avoid obsolete or near end-of-life (EOL) parts<\/li>\n<li data-section-id=\"1condsn\" data-start=\"1485\" data-end=\"1530\">Prefer components with multiple suppliers<\/li>\n<li data-section-id=\"b4rzp0\" data-start=\"1531\" data-end=\"1566\">Check global stock availability<\/li>\n<\/ul>\n<p data-start=\"1568\" data-end=\"1660\">This helps prevent delays in both <strong data-start=\"1602\" data-end=\"1628\">\u30d7\u30ed\u30c8\u30bf\u30a4\u30d7PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> and mass <strong data-start=\"1638\" data-end=\"1659\">PCB\u88fd\u9020<\/strong>.<\/p>\n<h4 data-start=\"1662\" data-end=\"1692\">Component standardization<\/h4>\n<p data-start=\"1694\" data-end=\"1771\">Reducing the number of unique components simplifies procurement and assembly:<\/p>\n<ul data-start=\"1773\" data-end=\"1911\">\n<li data-section-id=\"1xcos1e\" data-start=\"1773\" data-end=\"1817\">Use common resistor and capacitor values<\/li>\n<li data-section-id=\"hgjgax\" data-start=\"1818\" data-end=\"1866\">Standardize package sizes (e.g., 0402, 0603)<\/li>\n<li data-section-id=\"vc38z2\" data-start=\"1867\" data-end=\"1911\">Reuse components across multiple designs<\/li>\n<\/ul>\n<p data-start=\"1913\" data-end=\"1992\">Standardization improves efficiency in <strong data-start=\"1952\" data-end=\"1968\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> and reduces setup time.<\/p>\n<h4 data-start=\"1994\" data-end=\"2029\">MOQ and inventory optimization<\/h4>\n<p data-start=\"2031\" data-end=\"2090\">MOQ (Minimum Order Quantity) can significantly affect cost:<\/p>\n<ul data-start=\"2092\" data-end=\"2217\">\n<li data-section-id=\"v1s5d4\" data-start=\"2092\" data-end=\"2139\">Select components with flexible MOQ options<\/li>\n<li data-section-id=\"1dj9ajy\" data-start=\"2140\" data-end=\"2189\">Align quantities with actual production needs<\/li>\n<li data-section-id=\"f3xrtl\" data-start=\"2190\" data-end=\"2217\">Reduce excess inventory<\/li>\n<\/ul>\n<p data-start=\"2219\" data-end=\"2322\">This is particularly important when transitioning from <a href=\"https:\/\/txjpcba.com\/ja\/%e3%83%97%e3%83%ad%e3%83%88%e3%82%bf%e3%82%a4%e3%83%97pcb%e3%82%a2%e3%82%bb%e3%83%b3%e3%83%96%e3%83%aa\/\"><strong data-start=\"2274\" data-end=\"2300\">\u30d7\u30ed\u30c8\u30bf\u30a4\u30d7PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong><\/a> to volume production.<\/p>\n<h4 data-start=\"2324\" data-end=\"2363\">Design for manufacturability (DFM)<\/h4>\n<p data-start=\"2365\" data-end=\"2440\">BOM optimization also considers how components affect the assembly process:<\/p>\n<ul data-start=\"2442\" data-end=\"2603\">\n<li data-section-id=\"5rfaz8\" data-start=\"2442\" data-end=\"2501\">Choose packages suitable for automated <strong data-start=\"2483\" data-end=\"2499\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong><\/li>\n<li data-section-id=\"1h2ganb\" data-start=\"2502\" data-end=\"2544\">Avoid hard-to-place or rare components<\/li>\n<li data-section-id=\"1gknd5n\" data-start=\"2545\" data-end=\"2603\">Ensure compatibility with standard soldering processes<\/li>\n<\/ul>\n<p data-start=\"2605\" data-end=\"2665\">This reduces defects and improves yield in <strong data-start=\"2648\" data-end=\"2664\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong>.<\/p>\n<h3 data-section-id=\"1uisf7o\" data-start=\"2667\" data-end=\"2707\">Advanced BOM optimization strategies<\/h3>\n<h4 data-start=\"2709\" data-end=\"2740\">Approved vendor list (AVL)<\/h4>\n<p data-start=\"2742\" data-end=\"2884\">Creating an AVL ensures each component has multiple approved sources, reducing supply risk and improving flexibility in <a href=\"https:\/\/txjpcba.com\/ja\/%e3%83%97%e3%83%aa%e3%83%b3%e3%83%88%e5%9f%ba%e6%9d%bf%e8%a3%bd%e9%80%a0\/\"><strong data-start=\"2862\" data-end=\"2883\">PCB\u88fd\u9020<\/strong><\/a>.<\/p>\n<h4 data-start=\"2886\" data-end=\"2911\">Lifecycle management<\/h4>\n<p data-start=\"2913\" data-end=\"2964\">Components are evaluated based on lifecycle status:<\/p>\n<ul data-start=\"2966\" data-end=\"3059\">\n<li data-section-id=\"f4g00w\" data-start=\"2966\" data-end=\"2988\">Active (preferred)<\/li>\n<li data-section-id=\"1g3c0ui\" data-start=\"2989\" data-end=\"3030\">Not recommended for new design (NRND)<\/li>\n<li data-section-id=\"hf87l4\" data-start=\"3031\" data-end=\"3059\">Obsolete (to be avoided)<\/li>\n<\/ul>\n<p data-start=\"3061\" data-end=\"3097\">This prevents future redesign costs.<\/p>\n<h4 data-start=\"3099\" data-end=\"3133\">Alternative component mapping<\/h4>\n<p data-start=\"3135\" data-end=\"3252\">For each critical component, engineers identify drop-in replacements to handle shortages without redesigning the PCB.<\/p>\n<h3 data-section-id=\"1wseg3u\" data-start=\"3254\" data-end=\"3286\">Benefits of BOM optimization<\/h3>\n<p data-start=\"3288\" data-end=\"3339\">Optimizing your BOM provides measurable advantages:<\/p>\n<ul data-start=\"3341\" data-end=\"3550\">\n<li data-section-id=\"t13go4\" data-start=\"3341\" data-end=\"3375\">Lower component sourcing costs<\/li>\n<li data-section-id=\"bpt7l6\" data-start=\"3376\" data-end=\"3420\">Faster procurement and production cycles<\/li>\n<li data-section-id=\"k7yskf\" data-start=\"3421\" data-end=\"3460\">Reduced risk of shortages or delays<\/li>\n<li data-section-id=\"8rxd59\" data-start=\"3461\" data-end=\"3493\">\u88fd\u54c1\u306e\u4fe1\u983c\u6027\u5411\u4e0a<\/li>\n<li data-section-id=\"okoymq\" data-start=\"3494\" data-end=\"3550\">Easier scalability from prototype to mass production<\/li>\n<\/ul>\n<p data-start=\"3552\" data-end=\"3680\">These benefits apply across all stages of <strong data-start=\"3594\" data-end=\"3610\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong>, from early <strong data-start=\"3623\" data-end=\"3649\">\u30d7\u30ed\u30c8\u30bf\u30a4\u30d7PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> to full <strong data-start=\"3658\" data-end=\"3674\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> \u304c\u8d70\u308b\u3002.<\/p>\n<h3 data-section-id=\"1me1x65\" data-start=\"3682\" data-end=\"3710\">What you need to provide<\/h3>\n<p data-start=\"3712\" data-end=\"3778\">To optimize your BOM effectively, manufacturers typically require:<\/p>\n<ul data-start=\"3780\" data-end=\"3965\">\n<li data-section-id=\"xlu2vd\" data-start=\"3780\" data-end=\"3823\">Complete BOM file (Excel or CSV format)<\/li>\n<li data-section-id=\"11zkd9v\" data-start=\"3824\" data-end=\"3860\">Gerber files or PCB design files<\/li>\n<li data-section-id=\"2mud8y\" data-start=\"3861\" data-end=\"3897\">Assembly drawings (if available)<\/li>\n<li data-section-id=\"kprp5t\" data-start=\"3898\" data-end=\"3965\">Specific requirements (brand preferences, certifications, etc.)<\/li>\n<\/ul>\n<p data-start=\"3967\" data-end=\"4043\">The more detailed your input, the more precise the BOM optimization will be.<\/p>\n<h3 data-section-id=\"21o16q\" data-start=\"4045\" data-end=\"4070\">Collaboration process<\/h3>\n<p data-start=\"4072\" data-end=\"4117\">A typical BOM optimization workflow includes:<\/p>\n<ol data-start=\"4119\" data-end=\"4290\">\n<li data-section-id=\"10jlt6m\" data-start=\"4119\" data-end=\"4142\">Initial BOM review<\/li>\n<li data-section-id=\"1egabyy\" data-start=\"4143\" data-end=\"4178\">Cost and availability analysis<\/li>\n<li data-section-id=\"1c28u6f\" data-start=\"4179\" data-end=\"4217\">Alternative component suggestions<\/li>\n<li data-section-id=\"vx6bvx\" data-start=\"4218\" data-end=\"4245\">Engineering validation<\/li>\n<li data-section-id=\"d2sp92\" data-start=\"4246\" data-end=\"4290\">Customer approval before implementation<\/li>\n<\/ol>\n<p data-start=\"4292\" data-end=\"4375\">This ensures transparency and control throughout the <strong data-start=\"4345\" data-end=\"4366\">PCB\u88fd\u9020<\/strong> \u30d7\u30ed\u30bb\u30b9\u3060\u3002.<\/p>\n<h3 data-section-id=\"1079bb9\" data-start=\"4377\" data-end=\"4391\">\u7d50\u8ad6<\/h3>\n<p data-start=\"4393\" data-end=\"4695\">Yes, your BOM can absolutely be optimized\u2014and doing so can significantly improve both cost efficiency and production reliability. Professional <strong data-start=\"4536\" data-end=\"4552\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> providers combine engineering expertise, global sourcing networks, and real-time market data to refine your BOM for the best possible outcome.<\/p>\n<p data-start=\"4697\" data-end=\"4931\">Whether you are developing a new product through <strong data-start=\"4746\" data-end=\"4772\">\u30d7\u30ed\u30c8\u30bf\u30a4\u30d7PCB\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong> or preparing for high-volume <strong data-start=\"4802\" data-end=\"4818\">SMT\u30a2\u30bb\u30f3\u30d6\u30ea<\/strong>, BOM optimization is a critical step toward achieving a competitive and scalable <strong data-start=\"4900\" data-end=\"4921\">PCB\u88fd\u9020<\/strong> solution.<\/p>\n<p align=\"center\"><a href=\"\/ja\/%e3%83%97%e3%83%aa%e3%83%b3%e3%83%88%e5%9f%ba%e6%9d%bf%e3%82%a2%e3%82%bb%e3%83%b3%e3%83%96%e3%83%aa%e3%81%ae%e8%a6%8b%e7%a9%8d%e3%82%82%e3%82%8a%e3%82%92%e5%8f%96%e3%82%8b\/\"><button style=\"background: black; color: white; padding: 8px 20px; border: none; cursor: pointer;\">PCB\u30a2\u30bb\u30f3\u30d6\u30ea\u306e\u304a\u898b\u7a4d\u3082\u308a<\/button><\/a><\/p>\n<p style=\"text-align: center;\">\u30c7\u30b6\u30a4\u30f3\u30ec\u30d3\u30e5\u30fc\u304b\u3089\u7d0d\u54c1\u307e\u3067\u3001\u3059\u3079\u3066\u306e\u30b9\u30c6\u30c3\u30d7\u3092\u30b5\u30dd\u30fc\u30c8\u3057\u307e\u3059\u3002PCB\u30a2\u30bb\u30f3\u30d6\u30ea\u306e\u304a\u898b\u7a4d\u3082\u308a\u3092\u3054\u4f9d\u983c\u304f\u3060\u3055\u3044\u3002.<br \/>\nSMT\u3001DIP\u3001\u30d5\u30eb\u30bf\u30fc\u30f3\u30ad\u30fc\u30bd\u30ea\u30e5\u30fc\u30b7\u30e7\u30f3\u3092\u542b\u3080\u30d7\u30ed\u30d5\u30a7\u30c3\u30b7\u30e7\u30ca\u30eb\u306aPCB\u30a2\u30bb\u30f3\u30d6\u30ea\u30b5\u30fc\u30d3\u30b9\u3092\u63d0\u4f9b\u3057\u307e\u3059\u3002.<\/p>\n<p style=\"text-align: center;\">\u5229\u7528\u3067\u304d\u308b NDA \u2714 24 \u6642\u9593\u4ee5\u5185\u306e\u901f\u3044\u5f15\u7528\u8a9e\u53e5 \u2714 ISO \u306b\u3088\u3063\u3066\u8a3c\u660e\u3055\u308c\u308b\u5de5\u5834 \u2714 \u30ef\u30f3\u30b9\u30c8\u30c3\u30d7 PCB \u53ca\u3073 PCBA \u30b5\u30fc\u30d3\u30b9<\/p>","protected":false},"excerpt":{"rendered":"<p>Optimize my BOM Yes, optimizing your BOM (Bill of Materials) is a core capability of professional PCB Assembly providers. A [&hellip;]<\/p>","protected":false},"author":1,"featured_media":6513,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[71,445],"tags":[1580,1014,1581,1582,987,1579,1578,1576,1577],"class_list":["post-6512","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-faqs","category-pcb-assembly-faqs","tag-avl-electronics-sourcing","tag-bom-optimization-pcb-assembly","tag-component-lifecycle-management","tag-optimize-my-bom","tag-pcb-assembly-cost-reduction","tag-pcb-manufacturing-component-optimization","tag-prototype-pcb-assembly-bom-analysis","tag-reduce-bom-cost-electronics","tag-smt-assembly-bom-improvement"],"_links":{"self":[{"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/posts\/6512","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/comments?post=6512"}],"version-history":[{"count":1,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/posts\/6512\/revisions"}],"predecessor-version":[{"id":6514,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/posts\/6512\/revisions\/6514"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/media\/6513"}],"wp:attachment":[{"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/media?parent=6512"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/categories?post=6512"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/txjpcba.com\/ja\/wp-json\/wp\/v2\/tags?post=6512"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}